Unrestricted Report

ITEM NO:

Application No.

21/01052/FUL

Ward:

Crowthorne

Date Registered:

4 November 2021

Target Decision Date:

30 December 2021

Site Address:

18 Heath Hill Road North Crowthorne Berkshire RG45 7BX 

Proposal:

Proposed conversion of existing residential care home to form 8no. flats (2x1 bed, 5x2 bed and 1x3 bed), including external alterations.

Applicant:

Elkhorn Developments Ltd

Agent:

Mr Neil Davis

Case Officer:

Sarah Fryer, 01344 352000

Development.control@bracknell-forest.gov.uk

 

Site Location Plan  (for identification purposes only, not to scale)

 


OFFICER REPORT

 

1.    SUMMARY

 

1.1     This application seeks planning permission for conversion of a former residential care home to form 8 flats including some external alterations. The property is located within the settlement boundary, where the principle of development is acceptable. There are no objections from the Highway Authority or the Tree Service and the application is considered acceptable in terms of impact upon amenity and character of the area.

 

RECOMMENDATION

Planning permission be granted subject to completion of a S106 legal agreement and the conditions in Section 11 of this report

                      

2.    REASON FOR REPORTING APPLICATION TO COMMITTEE

 

2.1     The application is reported to committee as it has received more than 5 objections.

 

3.    PLANNING STATUS AND SITE DESCRIPTION

 

PLANNING STATUS

Within settlement boundary

 

3.1     18 Heath Hill Road North is located at the south eastern end of Heath Hill Road North, an unmade unadopted road within the settlement boundary of Crowthorne. It is a three storey detached building in red brick, part render with timber detailing and brown roof tiles which was last used as a care home.

 

3.2     To the front there is a brick wall defining the front amenity area, in front of this is a gravel parking area. There are two trees in proximity to the building, both of which are protected by a Tree Preservation Order (TPO).

 

3.3     The south east of the site is bordered by 37 and 39 St Johns Street, 2 storey residential properties. These properties are sited at 90 degrees to the application site. The rest of the site is surrounded by private detached residential dwellings.

 

4.    RELEVANT SITE HISTORY

 

4.1    The relevant planning history can be summarised as follows:

 

06/01136/FUL         Erection of part two storey and part first floor front and single storey side and rear extensions to care home.

Refused 02.03.2007

 

05/01149/FUL         Erection of part single storey part two storey rear extension, part two storey, part first floor front extension plus extension to second floor.

Refused 27.02.2006

 

05/00195/FUL         Installation of 2no. front facing dormers and rooflight associated with formation of new bedroom and bathroom at second floor level.

Approved 27.05.2005

 

05/00140/FUL         Erection of extensions and other alterations to residential care home to provide 1no. additional bedroom.

Refused 22.04.2005

 

04/01039/FUL         Erection of extensions and other alterations to residential care home to provide 3no. additional bedrooms.

Refused 20.12.2004

 

04/00445/FUL         Erection of extensions and other alterations to residential care home to provide 6no. additional bedrooms.

Refused 12.07.2004

 

00/01216/FUL         Erection of single storey rear extension, second floor front extension and retention of lean-to single-storey side extension forming boiler-house.]

Approved 06.04.2001

 

5.       THE PROPOSAL

 

5.1     Planning permission is sought for the change of use of the former C2 Care home to form 8no. C3 flats consisting of 2x1 bed, 5x 2 bed and 1 x 3 bed. This would include minor alterations to the fenestration, including enlargement of the existing dormer window to the front and back.

 

5.2     Parking for the new flats would be provided to the front and rear of the property, whilst amenity space would be provided to the rear.

 

6.       REPRESENTATIONS RECEIVED

 

6.1     Crowthorne Parish Council

·         The developers should review the siting of balconies and large windows with overlook neighboring properties specifically 37 and 39 St Johns Street.

·         The Provision of disabled parking should be shown clearly.

·         A configured plan of designate car parking which conforms to BFBC policy should be provided.

·         A condition is required that the road surface needs to be attended to whilst the renovation takes place.

·         Further concern about the impact additional traffic will have on the surface of the un-adopted road and the impact that will have on other residents.

 

6.2     Other Representations

6 letters of objection have been received making the following comments:

·        Change of use to 8 flats constitutes excessive development.      

·        The proposal will result in unacceptable traffic along the private road

·        The number of anticipated vehicles will result in parking off site along Heath Hill Road North, resulting in conflicts between pedestrians and vehicles creating a safety hazard.

·        Will increase number of deliveries which will add to the wear and tear along Heath Hill Road North and St Johns Street. Mitigation for these costs and a long-term upkeep plan designed by the Council are required as a minimum.

·        Suitable provision in the legal ownership requirements towards the maintenance and upkeep of the road should be made [Officer comment: This is a civil and not a planning matter].

·        The access to the car park off an unadopted private road. Given the nature of the surrounding properties lines of sight for using the access and the exit will be restricted, leading to accidents.

·        The development of carpark to the rear is out of keeping with the surrounding neighbourhood, leading to noise and disturbance.

·        Water run-off from the carpark in the rear will put additional strain upon the local drainage network.

·        The addition of windows and doors directly overlooking 39 St Johns Street would result in unacceptable levels of overlooking [Officer comment: No new windows or doors are being provided in the south eastern elevation. Please see officer’s report below].

·        Concerns about high hedges being planted along the boundary.

 

7.       SUMMARY OF CONSULTATION RESPONSES

 

          Highway Authority

7.1 No objection subject to conditions.

 

          Tree Service

7.2 No objection in principle, request further information which can be secured by conditions.

 

8.       MAIN POLICIES AND OTHER DOCUMENTS RELEVANT TO THE DECISION

 

8.1     The primary strategic planning considerations applying to the site and associated policies are:

 

 

Development Plan

NPPF

General policies

CS1 and CS2 of the CSDPD

Consistent

Design

CS7 of the CSDPD,

CR1 and CR3 of CNP

Consistent

Amenity

‘Saved’ policies EN1, EN2 and EN20 of the BFBLP

Consistent

Highways

‘Saved’ policy M9 of the BFBLP

CS23 of the CSDPD

Consistent - Para. 105 refers to LPAs setting their own parking standards for residential development

SPA

‘Saved’ Policy NRM6

‘Saved’ Policy EN3 of the BFBLP 

CS14 of the CSDPD

Consistent

Supplementary Planning Documents (SPD)

Bracknell Forest Borough Parking Standards, Supplementary Planning Document (2016)

Bracknell Forest Borough Streetscene Supplementary Planning Document (2011)

Bracknell Forest Design Supplementary Planning Document (2017)

Thames Basin Heaths Supplementary Planning Document (2018)

Other publications

National Planning Policy Framework (NPPF)

 

9.       PLANNING CONSIDERATIONS

 

9.1     The key issues for consideration are:

i.              Principle of Development

ii.             Impact on Character and Appearance of Surrounding Area

iii.            Consideration of Tree Constraints

iv.           Impact on Residential Amenity

v.             Transport and Highways Considerations

vi.           Thames Basin Heaths SPA

 

i.              Principle of Development

 

9.2     The site is located within the settlement boundary of Crowthorne. Development would therefore accord with Policy CS2 which permits developments within defined settlements, providing its consistent with the character and accessibility.

 

9.3     The proposal would result in the loss of a C2 residential care facility.

 

9.4     The loss of a care home would not be contrary to planning policy.  However, it is recognised that care homes play an important role in providing a range of housing to meet the needs of the community.  In this instance, the size and layout of the building prohibited it being a viable care home facility. Several attempts were made to obtain planning permission to extend the home to improved facilities and increase capacity, but these were refused due to the constraints of the site.  

 

9.5     Accordingly, there is no objection to the loss of this property as a care home or the principle of it’s re-use for C3 residential purposes.

 

ii.            Impact on Character and Appearance of Surrounding Area

 

9.6     The site is located within the Character Area B – Crowthorne West as defined by the Character Area Assessment SPD. This area is dominated by a grid pattern of development with strong links to Crowthorne Town Centre, with a wide variety of house styles. It is noted that the unmade roads create a special semi-rural character close to the local centre.

 

9.7     There are few proposed changes to the building, the most visible being the enlargement of the dormer windows. The changes are not considered to affect the character or appearance of the building and hence would have a neutral impact upon the character of the area.

 

9.8     The area is primarily residential comprising of single dwellings, and objections have been received on the basis that the proposal is an over development of the site. The proposal is contained within the extent of the existing building, with minimal alteration. The largest change would be the use of the rear amenity are as parking. This is located to the rear, and therefore not visible from the streetscene and as a result is considered to have a minimal impact upon the character of the area.

 

9.9     It is concluded that the proposal would maintain the character and appearance of the area, in accordance with Policy CS7 of the CSDPD, Policy CS20 of the BFBLP and Policies CR1, CR3 of the Crowthorne Neighbourhood Plan. 

 

iii.           Impact on nearby Trees

 

9.10   Trees protected by TPO 777 and TPO 55 are subject to consideration of this application, specifically a Scots Pine (T1 of TPO 777) located at the front of the property and Beeches (T2 and T3 of TPO 55 identified as 01 by the agent) on adjacent land (39 St Johns Street).

 

9.11   In principle the Tree Service has no objection to the proposed conversion. The footprint of the development is largely consistent with the existing one, with a minor alteration resulting from the demolition of a small side/ front extension. The relationship between existing trees and the current building is sustainable, albeit the foreseeable need for minor pruning. Any pruning of protected trees would require a TPO application and Local Planning Authority approval prior to undertaking any works.

 

9.12   The arboricultural report does not currently contain technical design information sufficient to ensure that the trees are appropriately protected. In particular, detail regarding the hard standing/ boundary treatments (removal and installation methodology, coverage extent, construction design) and bin store should be sought prior to the commencement of works.

 

9.13   It is the preference of the Tree Service that that much of the area around Pine T02 is returned to soft landscaping and where hard surfacing is deemed necessary, a porous none dig option should be employed. A landscaping condition is recommended to ensure this.

 

9.14   Although the reports lack the required detail at present, it is considered acceptable that such information could be secured by pre-commencement conditions. Accordingly, the Tree Service has no objection.

 

iv.           Impact on Residential Amenity

 

9.15   Policy EN20 vii of the BFBLP states that in considering proposals the Local Planning Authority will ensure that the proposal does not adversely affect the amenity of surrounding properties.

 

 

 

 

 

9.16   18 Heath Hill Road North is located close to the junction with St John’s Street, with the result that numbers 37 and 39 St Johns Street face the flank elevation of 18 Heath Hill Road. The application property already has ground and first floor windows facing the rear elevations of 37 and 39 St Johns Road. These windows previously served bedrooms for care home residents, as shown on the existing plans below. 

 

 

9.17   The proposal would result in two of the first-floor windows being blocked up and a small window being re-glazed with obscure glass as it is proposed to serve a bathroom. The rooms served by the windows were and will continue to be bedrooms, in the same use and therefore it is considered that there is no more additional harm to the overlooking of neighbouring properties. As one set of windows is now being infilled, and one window obscurely glazed, there is a reduction on overall overlooking. This is shown on the proposed plans below. 

 

 

9.18   At ground floor level, windows are being changed for French doors. There is a 1.8m fence separating the properties and preventing overlooking.

 

9.19   New roof lights are proposed to the south eastern elevation. The cills of these is above 1.8m consequentially, no overlooking will result from these roof lights.

 

9.20   In conclusion, whilst the proposal does not meet the separation distances found within the Design SPD, this is an existing situation. Where possible it is proposed to block up or remove a number of windows reducing the potential for overlooking and any new roof lights will have a cill height of at least 1.7m. The originally proposed balconies have been removed. 

 

9.20   Amenity space is being provided for new residents either in an area immediately outside the units, or communal space to the rear and next to the parking.

 

9.21   Accordingly, the proposal is considered to comply with BFBLP Policy EN20 criterion vii.

 

v.            Transport and Highways Considerations

 

9.22   Amendments have been made to the proposed site plan to resolve the Highway Authority's previous concerns.

 

Access

9.23   Heath Hill Road North is an unmade, unadopted, road which forms a loop (along with St John's Road), which connects to Dukes Ride, circa 125m to the north-west of the site. The location of 18 Heath Hill Road North is such that passing traffic levels are likely to be minimal, as neighbouring residents to the south have options of using either St John's Road or Heath Hill Road North to route to Dukes Ride.

 

9.24   In the north-eastern corner of the site there is a telegraph pole and a store associated with the existing building which is forward of the main existing wall line. The application proposes to relocate the telegraph pole and locate bin storage in the north-east corner of the site, facing Heath Hill Road North, which is considered acceptable from a highways perspective as this should allow refuse to be collected from Heath Hill Road North in the same way as for neighbouring dwellings.

 

9.25   The application proposes an accessway to the rear parking area down the south-western side of the building. The applicant has committed to removing existing width constraints along this route, such as drainage currently located on the outside wall, which would improve the width over that currently available, but the resulting width of circa 3.3m would only be sufficient for single-way working adjacent to the side of the building over a length of circa 13.8m.

 

9.26   In order to best manage the single-way working corridor along the side of the building, the amended plans show waiting areas at each end of the single-way working section. In the north of the site, an area circa 5.8m in width and circa 5.0m long is provided, where a vehicle can wait after leaving Heath Hill Road North if there is another vehicle exiting the rear car park via the accessway in the opposite direction. This waiting area should also improve visibility to oncoming traffic north-westwards along Heath Hill Road North for vehicles

leaving the site and should be secured by condition. Similarly, adjacent to the rear car park, there is a suitably sized waiting area where a vehicle could stop if there is another vehicle entering the rear car park via the accessway. A condition should be appended to planning permission, if granted, to provide a plan showing how the single-way working and waiting areas are to be signed and marked-out to ensure that they do not become obstructed by parked vehicles.

 

9.27   Accordingly, though the access to the rear car park has a single-way working section, the applicant's provision of waiting areas at either end along with the very low level of traffic passing the site on Heath Hill Road North is considered to provide safe and suitable access to the site and its parking, subject to suitable conditions.

 

9.28   Pedestrian access is proposed to both the front of the building (to Heath Hill Road North) and to the rear car park, meeting in a central lobby area within the building.

 

Parking

9.29   15 car parking spaces are proposed, providing 14 car parking spaces for residents and a single visitor space (meeting the Parking Standards SPD requirements).

 

9.30   All parking spaces are proposed to have 7kW electric vehicle charge points installed from the outset, taking into account the move towards EV infrastructure which is welcomed.

 

9.31   Cycle parking is provided as two-tier gas-lifted cycle stands in a dedicated cycle store to the rear of the car park. This is considered acceptable, however the doors should be sliding to ensure appropriate access.

 

9.32   Accordingly, the cycle and vehicle parking meet the council’s standards contained within the Parking SPD.

 

Trips

9.33   The proposed flats are estimated to generate circa 30 trips over the day as a whole with circa 4 trips in each of the AM and PM peak hours. This estimate is provided without discounting for the extant care home use of the site, which would reduce the cumulative impact if it were taken into account.

 

9.34   The Highway Authority has no objection to the proposal subject to conditions.

 

vi.           Thames Basin Heaths SPA  

 

9.35   In the light of the “Sweetman Judgement” (People Over Wind and Sweetman v Coillte Teoranta, April 2018), the comments below comprise an Appropriate Assessment which includes advice on necessary avoidance and mitigation measures which is consistent with the advice provided to the Planning Inspectorate on such matters.

 

9.36   In accordance with the Conservation of Habitats and Species Regulations 2017 (as amended) Bracknell Forest Council (BFC) has carried out a Habitats Regulations Assessment of the proposed development.

 

9.37   The following potential adverse effects on habitats sites were screened out of further assessment:

 

-       Loss of functionally linked land (TBH SPA)

-       Air pollution from an increase in traffic (TBH SPA, Windsor Forest and Great Park

-       Special Area of Conservation (SAC), Thursley, Ash, Pirbright and Chobham SAC and Chilterns Beechwoods SAC)

 

9.38   Recreational pressure on the TBH SPA was screened in for Appropriate Assessment.

 

9.39   BFC, in consultation with Natural England, has formed the view that any net increase in residential development between 400m and 5km straight-line distance from the Thames Basin Heath Special Protection Area (TBH SPA) along with any larger developments comprising over 50 net new dwellings within the 5 - 7km zone is likely to have a significant effect on the integrity of the TBH SPA, either alone or in-combination with other plans or projects.

 

9.40   This site is located within the 400m – 5kmThames Basin Heaths Special Protection Area (TBH SPA) buffer zone and therefore is likely to result in an adverse effect on the SPA, unless it is carried out together with appropriate avoidance and mitigation measures.

 

9.41   On commencement of the development, a contribution (calculated on a per-bedroom basis) is to be paid to BFC towards the cost of measures to avoid and mitigate against the effect upon the TBH SPA, as set out in BFC's Thames Basin Heaths Special Protection Area Supplementary Planning Document (SPD) (April 2018)

 

9.42   The strategy is for relevant developments to make financial contributions towards the provision of Suitable Alternative Natural Greenspaces (SANGs) in perpetuity as an alternative recreational location to the TBH SPA and financial contributions towards Strategic Access Management and Monitoring (SAMM) measures. The Council will also make a contribution towards SANG enhancement works through Community Infrastructure Levy (CIL) payments whether or not this development is liable to CIL.

 

9.43   In this instance, the development would result in a net increase of 2 x one-bedroom dwellings, 5 x two-bedroom dwellings and a single three-bedroom dwelling within the 400m 5km TBH SPA buffer zone which results in a total SANG contribution of £40,883.

 

9.44   The development is required to make a contribution towards Strategic Access Management and Monitoring (SAMM) of £5,234 which is also calculated on a per bedroom basis.

 

9.45   The total SPA related financial contribution for this proposal is £46,117.  The applicant must agree to enter into a S106 agreement to secure this contribution and a restriction on the occupation of each dwelling until BFC has confirmed that open space enhancement works to a SANG is completed. Subject to the completion of the S106 agreement, the proposal would not lead to an adverse effect on the integrity of the SPA and would comply with South East Plan saved Policy NRM6, saved policy EN3 of the Bracknell Forest Borough Local Plan (2002), Policy CS14 of the Core Strategy Development Plan Document (2008), the Thames Basin Heaths Special Protection Area Supplementary Planning Document and the National Planning Policy Framework.

 

10.     CONCLUSIONS

 

10.1   The application seeks to change the use of the existing building from a care home to 8 residential apartments with associated parking and amenity space.

 

10.2   The application has been assessed in terms of highway safety and would provide parking in accordance with the Parking SPD. There is sufficient space to enable manoeuvring in the rear, leaving some amenity space for the future resident and access down the side is considered acceptable. Accordingly, there is no objection on highway safety grounds.

 

10.3   The number of windows to the south eastern elevation which faces the rear of the properties on St Johns Street has been reduced, reducing overlooking. Bathroom windows are recommended to be conditioned to be obscurely glazed and all new rooflights have a cil height of above 1.7m from the internal floor level. Accordingly, the overlooking reduced and as such impact upon the amenities of existing and future residents is considered acceptable.

 

10.4   Minimal alterations are proposed to the elevations, principally the construction of a bin store to the front in place of an existing extension. The Tree Service has raised no objection and the alterations are not considered to alter the character or the building or area and as such the proposal is considered to be acceptable in terms of character of the area.

 

10.5   In conclusion, the building had come to the end of its life as a care home and was unsustainable. The proposal would be contained within the existing footprint with parking to the front (as existing) and rear accessed to the side. The proposal, as outlined above, is considered to comply with Polices CS1, CS14, CS23 of the Core Strategy DPD. EN3, EN20 of the Bracknell Forest Borough Local Plan and CR1 and CR3 of the Crowthorne Neighbourhood Plan.

 

 

11.     RECOMMENDATION

 

Following the completion of planning obligation(s) under Section 106 of the Town and Country Planning Act to secure SPA Mitigation, that the Assistant Director: Planning APPROVE the application subject to the following conditions amended, added to or deleted as the Assistant Director: Planning considers necessary:

 

01.       The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

            REASON: To comply with Section 91 of the Town and Country Planning Act 1990.

 

02.       The development hereby permitted shall be carried out only in accordance with the following approved plans and other submitted details, received by the Local Planning Authority,

            01 (Location Plan)

            07 Rev. E (Site Plan Proposed)

            08 Rev D (Proposed Ground Floor Plan)

            09 Rev. A (First floor plan)

            10 Rev. A (Second Floor Plan)

            11 Rev. C (Elevations Proposed)

            12 Rev A (Cycle Store details)

                  

            Arboriculture Assessment and Method Statement (ref. MW.21.0809.AIA)

           

            REASON: To ensure that the development is carried out only as approved by the Local Planning Authority.

 

03.       No development shall take place until a plan showing visibility splays at the site access onto Heath Hill Road North has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. The visibility splays shall thereafter be kept free of all obstructions to visibility over a height of 0.6 metres measured from the surface of the adjacent carriageway.

            REASON: In the interests of highway safety.

            [Relevant Policies: Core Strategy DPD CS23]

 

04.       No development shall take place until details of the accessway along the north-western side of the building have been submitted to and approved in writing by the Local Planning Authority. Details shall include:

            (a) Confirmation that all obstructions to the width of the accessway will be removed such that the full width between the boundary and side of the building is available for vehicle movement;

            (b) Details of signage and markings to indicate vehicle priority and to ensure that the accessway and waiting areas at either end will be kept clear and unobstructed; and

            (c) Details of how enforcement of the areas to be kept clear and unobstructed in (b) above will be enforced.

            No dwelling shall be occupied until the accessway has been laid out within the site in accordance with the approved details and the accessway shall be operated in accordance with the approved details at all times. 

            REASON: In the interests of highway safety.

            [Relevant Policies: Core Strategy DPD CS23, NPPF paragraphs 110b) and 112c)]

 

05.       No dwelling shall be occupied until a means of access for pedestrians to Heath Hill Road North and to the rear parking area has been constructed in accordance with the approved plans.

            REASON: In the interests of accessibility and to facilitate access by pedestrians.

            [Relevant Policies: BFBLP M6, Core Strategy DPD CS23]

 

06.       No dwelling shall be occupied until the associated vehicle parking and turning space has been surfaced and marked out in accordance with the approved drawing and the electric vehicle charging infrastructure has been provided. Thereafter, the parking spaces and turning space shall be kept available for parking and turning at all times and electric vehicle charging infrastructure shall be maintained in working order.

            REASON: To ensure that the development is provided with adequate car parking, to prevent the likelihood of on-street car parking which would be a danger to other road users, and parking which is designed to enable charging of plug-in and other ultra-low emission vehicles in safe, accessible and convenient locations.

            [Relevant Policies: BFBLP M9, Core Strategy DPD CS23, NPPF paragraph 112e)]

 

07.       No dwelling shall be occupied until 16 secure and covered cycle parking spaces have been provided in the location identified for cycle parking on the approved plans within the development.  The cycle parking spaces and facilities shall thereafter be retained. The door(s) to the cycle store shall be of a sliding or roller-shutter design. Any door replacement or repair shall only be with a sliding or roller-shutter type door.

            REASON: In the interests of accessibility of the development to cyclists and to ensure that the cycle store can be accessed when the door(s) are open.

            [Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

08.       No gates shall be provided at the vehicular access to the site.

            REASON: In the interests of highway safety.

            [Relevant Policies: Core Strategy DPD CS23]

 

09.       No development (including initial site-clearance) shall commence until a detailed scheme for the protection of existing trees to be retained, in accordance with British Standard 5837 (2012) 'Trees in relation to design, demolition and construction - Recommendations' (or any subsequent revision), has been submitted to and approved in writing by the local planning authority. Protection measures shall be phased as necessary to account for and provide protection during demolition, construction and hard landscaping works. Details shall include an approved development layout plan at a minimum scale of 1:200, showing the following:

            a) Accurate trunk positions and canopy spreads of all existing trees within the site and on adjoining land adjacent to the development as identified within the Arboriculture Assessment and Method Statement (ref. MW.21.0809.AIA)  ,

            b) Proposed location/s of protective barrier/s, supported be a metal scaffold framework, constructed as a minimum in accordance with Section 6 (Figure 2), to include appropriate weatherproof tree protection area signage securely fixed to the outside of the protective fencing structure at regular intervals.

            c) Illustration/s of the proposed protective barriers to be erected.

            d) Proposed location/s and illustration/s of site-specific ground protection measures within the main root protection areas of retained trees, designed as necessary for pedestrian light traffic or heavy plant machinery, as necessary to prevent contamination and ground compaction

            e) Annotated minimum distances between protective barriers and trunks of retained trees at regular intervals

            f) All fenced off areas clearly annotated as tree protection areas/construction exclusion zones

            g) Notes regarding restrictions which apply to tree protection areas/construction exclusion zones

            h) Arboricultural site monitoring - Note confirming that all protection measures are to be routinely monitored by site visits undertaken by a project arboriculturist (appointed by the land owners), at maximum 4-week intervals for the duration of all works on site to ensure full compliance with the approved tree protection and monitoring scheme. Copy of signed report to be forwarded to the local authority following each site visit.

            The development shall be carried out in full accordance with approved scheme.

            REASON:- In order to safeguard trees and other vegetation considered to be worthy of retention in the interests of the visual amenity of the area.

 

10.       The protective fencing and other protection measures specified by condition 09 shall be installed in the locations agreed in writing by the local planning authority prior to the commencement of any development works, including any initial clearance, and shall be maintained fully intact and (in the case of the fencing) upright, in its approved locations at all times, until the completion of all building operations on the site. Where phased protection measures have been approved, no works shall commence on the next phase of the development until the protective fencing barriers and other protective measures have been repositioned for that phase in full accordance with the approved details. No activity of any description must occur at any time within these areas including but not restricted to the following:-

            a) No mixing of cement or any other materials.

            b) Storage or disposal of any soil, building materials rubble, machinery, fuel, chemicals, liquids waste residues or materials/debris of any other description.

            c) Siting of any temporary structures of any description including site office/sales buildings, temporary car parking facilities, porta-loos, storage compounds or hard standing areas of any other description.

            d) Soil/turf stripping, raising/lowering of existing levels, excavation or alterations to the exiting surfaces/ground conditions of any other description.

            e) Installation/siting of any underground services, temporary or otherwise including: drainage, water, gas electricity, telephone, television, external lighting or any associated ducting.

            f) Parking/use of tracked or wheeled machinery or vehicles of any description.

           

            In addition to the protection measures specified above.

            a) No fires shall be lit within 20 metres of the trunks of any trees or the centre line of any hedgerow shown to be retained.

            b) No signs, cables, fixtures or fittings of any other description shall be attached to any part of any retained tree.

            REASON:- In order to safeguard trees and other vegetation considered to be worthy of retention in the interests of the visual amenity of the

 

11.       No development shall commence until a detailed site-specific construction method statement for all hard surfaced areas of any description within the minimum root protection areas of retained trees calculated in accordance with British Standard 5837 (2012) 'Trees in relation to design, demolition and construction - Recommendations' or any subsequent revision, has been submitted to and approved in writing by the local planning authority. Details shall be based on a porous 'No Dig' principle of construction, avoiding any excavation of existing levels in all areas concerned, and shall include:-

            a) An approved development layout plan identifying all areas where special construction measures are to be undertaken.

            b) Materials including porous surface finish.

            c) Construction profile/s showing existing/proposed finished levels together with any grading of levels proposed adjacent to the footprint in each respective structure.

            d) Program and method of implementation and arboricultural supervision.

            The construction method statement shall be implemented in full accordance with the approved scheme, under arboricultural supervision, prior to the occupation of the dwelling. The 'No Dig' structure shall be retained in perpetuity thereafter.

            REASON:- In order to alleviate any adverse impact on the root systems and the long-term health of retained trees, in the interests of the visual amenity of the area.

 

12.       The development shall not be occupied until a scheme depicting hard and soft landscaping has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include a 3 year post planting maintenance schedule. All planting comprised in the soft landscaping works shall be carried out and completed in full accordance with the approved scheme, in the nearest planting season (1st October to 31st March inclusive) to the completion of the development or prior to the occupation of any part of the approved development, whichever is sooner. All hard landscaping works shall be carried and completed prior to the occupation of any part of the approved development. As a minimum, the quality of all hard and soft landscape works shall be carried out in accordance with British Standard 4428:1989 'Code Of practice For General Landscape Operations' or any subsequent revision. All trees and other plants included within the approved details shall be healthy, well-formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) 'Specifications For Trees & Shrubs' and British Standard 4043 (where applicable) or any subsequent revision.  Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved.

            REASON: In the interests of good landscape design and the visual amenity of the area.

            [Core Strategy DPD CS7, BFBLP 'Saved' Policies EN2 and EN20]

 

13.       Those windows shown on the approved drawings as having obscured glazing in part or full shall at all times be so fitted.  The obscure glazing shall be a minimum of Pilkington Level 3 or equivalent.

            REASON: To prevent the overlooking of neighbouring property.

            [Relevant Policies: BFBLP EN20]

 

14.       The rooflights in the roof slope of the proposed development shall at all times be no less than 1.7 metres above internal floor level.

            REASON: To prevent the overlooking of neighbouring property.

            [Relevant Policies: BFBLP EN20]

 

 

Informative(s)

 

01.       The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework

 

02.       Notwithstanding the detail shown on the approved plans and wording within Bracknell Forest Council's Parking Standards SPD, the Building Regulations part S "Infrastructure for the charging of electric vehicles" 2021 edition takes effect on 15 June 2022 for use in England. It does not apply to work subject to a building notice, full plans applications or initial notices submitted before

            that date, provided the work is started on site before 15 June 2023. The applicant should familiarise themselves with, and comply with, the requirements of this document with regard to provision of electric vehicle charging infrastructure.

 

03.       Trees on and adjacent to this site are protected by Tree Preservation Orders. In simple terms, detailed written consent must be therefore obtained from the Council's Tree Service before undertaking any form of work to such trees (including any work affecting their root systems), unless such work has been specifically approved in writing as part of this planning permission. Any pruning or removal of trees without the necessary consent or any damage arising from non-compliance with other conditions of this permission may be liable to prosecution by the Council. Property owners, developers and/or any other relevant persons are therefore advised to take appropriate measures to ensure all persons responsible for overseeing works approved under this permission are suitably briefed.

 

04.       No details are required to be submitted in relation to the following conditions; however they are required to be complied with:

01. Time limit

02. Approved plans

05. Access for pedestrians

06. Vehicle parking and turning provided.

07. Cycle Parking and storage

08. No gates

13. Obscure glazing

14. Skylights.

 

The applicant is advised that the following conditions require discharging prior to commencement of development:

03. Visibility Splays

04. Details of access way along side of building

09. Protection of trees

10. Protective tree fencing

11. Method Statement

 

The applicant is advised that the following conditions require discharging prior to occupation of development:

12. Hard and soft landscaping

 

In the event of the S106 agreement not being completed by 24th June 2022, the Assistant Director: Planning be authorised to either extend the period further or refuse the application for the following reason: -

 

01   In the absence of a planning obligation to secure suitable avoidance and mitigation measures and access management monitoring arrangements, in terms that are satisfactory to the Local Planning Authority, the proposal would be contrary to Regulation 63(5) of the Conservation of Habitats and Species Regulations 2017 (as amended), Policy NRM6 of the South East Plan, Policy EN3 of the Bracknell Forest Borough Local Plan, Policy CS14 of the Core Strategy Development Plan Document and the Thames Basin Heaths Special Protection Area Supplementary Planning Document (2018).